The open-circuit test on a transformer is usually performed by ___

The open-circuit test on a transformer is usually performed by exciting the low voltage winding.

This is because

A. it draws sufficiently large no-load current which can be conveniently measured
B. The required power input is low
C. it is not advisable to work on high voltage side
D. the voltage required is low

Show Answer

Answer: A