After a control transformer has been zeroed and clamped down, what is the final step in the zeroing procedure?

After a control transformer has been zeroed and clamped down, what is the final step in the zeroing procedure?

A. Recheck the zero voltage reading
B. Turn it to 270 degrees
C. Disconnect all wires to the control transformer
D. Replace the fuses

Show Answer

Answer: A